The high speed railway line has been announced.
here are the PDFs of the Route:
Great Missenden section (1.5 MB PDF)
Amersham section
Chalfont St Giles section
The whole thing (6 MB PDF)
The Government says the route, which follows the A413 corridor, 'appears best to meet the Government’s objectives for optimising journey times and cost, and for managing impacts on the local environment and communities in an acceptable way. '
The other two routes are 'significantly inferior'. This route would run in tunnel from a rebuilt Euston Station, surfacing in West London to follow the route of the existing Chiltern Line, leaving London near Ruislip. 'The route would proceed largely in tunnel from the M25 as far as Amersham, and then continue above ground to the west of Wendover and Aylesbury, partly in tunnel and partly following the existing A413 and Chiltern Line corridor.
all maps are here: http://www.dft.gov.uk/pgr/rail/pi/highspeedrail/hs2ltd/route
Chiltern
PC is a Great Missenden based PC support company and
a complete
one-stop shop for websites.
PC Support
This can range from
fixing PCs that crash, hang or just go painfully slow, data recovery,
connecting
your PC to the internet, transferring details from one PC to another.
Websites
We provide a complete solution for your website requirements -
from the initial design to the implementation and hosting -
includes domain registration, hosting, dynamic pages, email
accounts and search engine submission.
Anti virus programs
AVG is still free (for non-commercial use) from here:
Microsoft are now giving away (i.e. free) anti virus software from here how to use the anti-virus from microsoft is here:
|